At the end of the fourth batch of environmental protection supervision, another 12 packaging and printing plants were named and notified. Release date: 2017 scrap steel can be transported as raw materials to xin3zhou special steel plant across the wall for smelting source: China printing carton editor: Yu Jia browse times: 3296 copyright and disclaimer

core tips: the fourth batch of 8 central environmental protection supervision teams visited Jilin, Zhejiang, Shandong, Hainan, Sichuan, Tibet, Qinghai Xinjiang (including the Corps) and other provinces (regions) carry out supervision. As of September 15, all the eight inspection teams had completed the work of stationing inspectors and entered the stage of inspection report. Recently, according to incomplete statistics, another 12 packaging and printing factories have been notified by name

[China Packaging News] the fourth batch of eight Central environmental protection supervision teams conducted supervision in Jilin, Zhejiang, Shandong, Hainan, Sichuan, Tibet, Qinghai, Xinjiang (including the Corps) and other provinces (regions) from August to September 2017. As of September 15, all the eight inspection teams had completed the work of stationing inspectors and entered the stage of inspection report. Recently, according to incomplete statistics, another 12 packaging and printing factories have been notified by name

12 packaging and printing plants were named and notified

1. Pfizer carton factory:

on the evening of September 11, 2017, wangjianghong, deputy director of Wuyi branch of the Municipal Environmental Protection Bureau, led the environmental supervisors to work with the personnel of the Environmental Protection Office of Laodian town to quickly dispatch to conduct surprise inspection on the demolition and modification of coal-fired boilers in the whole region. Order Pfizer carton factory to use clean energy

2. Dingxing carton factory:

order Dingxing carton factory in Laodian town to dismantle the coal-fired facilities within 3 days

3. TangChang branch of Dayi County Yuelai paper mill:

according to the investigation by Chengdu Environmental Protection Bureau, the TangChang branch of Dayi County Yuelai paper mill was investigated and punished by Dayi County Environmental Protection Bureau for its illegal use of monitoring equipment and excessive discharge of air pollutants in February and March 2017, and the person in charge of the plant was administratively detained. The plant began to stop production on March 5, 2017, and the combustion boiler was dismantled. At present, the plant is in a state of long-term shutdown. On september11,2017, the factory issued the shutdown certificate on the "Sichuan key monitoring enterprise pollution source monitoring information disclosure platform"

4. Mianyang Lantian Paper Co., Ltd.:

according to the investigation of Mianyang Environmental Protection Bureau, Mianyang Lantian Paper Co., Ltd. stopped production in January 2016, completed the installation of gas-fired boilers at the end of April 2017, switched to burning clean energy natural gas, and conducted trial operation on May 6. On July 23, due to the failure of gas-fired boilers, it has stopped production since 17:00 p.m. that day, so it has not disclosed its self-monitoring information

5. Jining Aerospace Packaging Co., Ltd.:

began to produce cartons in the self built factory in February, 2004. Sometimes, color films are pasted according to customers' needs, and there are overtime production at night. The enterprise is engaged in water-based printing, without using oil ink cartridge. The purchased water-based ink is directly added to the ink tank of the printing machine for use, and no waste ink is discharged. The packaging barrels are not hazardous wastes, and are stored in the warehouse. They are recycled by the manufacturer for secondary utilization, and the materials can be recycled without random stacking. At present, the enterprise has not installed VOCs treatment facilities

in response to the problem that Jining Aerospace Packaging Co., Ltd. did not install VOCs control facilities, on September 7, 2017, Rencheng District Environmental Protection Bureau issued a rectification notice to it, ordering it to speed up the construction of VOCs control facilities and complete the control tasks on schedule

6. Zibo Yongming packaging factory:

a fine of 20000 yuan was imposed because "the project with an annual output of 5million square cartons and cartons has not been approved by the environmental protection department, and the project has been completed and put into production; the supporting environmental protection facilities for the construction of other material projects without lists have not been completed, have not been accepted or have not been accepted, and the main project has been officially put into production or use", Legal representative: accura HPC (high performance composite material) for prox 800 combines excellent rigidity and high-throughput production capacity in one Aiwa

7. Zhengzhou Pengyu packaging products Co., Ltd.:

printing section has no pollution control facilities and VOCs are directly discharged

8. Zhengzhou Taoyuan Packaging Co., Ltd.:

has a set of offset printing machine, and no supporting VOCs treatment facilities have been built

9. Zhengzhou Huazhong packaging materials Co., Ltd.:

for enterprises outside the "scattered pollution" list, the on-site personnel refused to open the door and refused to inspect

10. Zhengzhou Donggang Security Printing Co., Ltd.:

during on-site inspection, the enterprise stopped production. The printing process is not equipped with a gas collecting hood to effectively collect VOCs gas, and the gas collecting pipeline of the activated carbon adsorption facility has been disconnected. The waste oil and ink tanks were not stored in a standardized manner according to the hazardous waste management requirements

11. Henan Caihong guangluo Printing Co., Ltd.:

it was in production at the time of on-site inspection. There were no pollution control facilities in the printing section. The ink volatile gas was directly discharged, and the dust was directly discharged into the external environment

12. Henan Xinhua Printing Group Co., Ltd.:

after on-site inspection, the enterprise is in production. There is one production line and two printing equipment without VOCs collection and treatment facilities, and organic waste gas is discharged unorganized